In most power generation facilities, the single-line diagram looks neat and controlled. In reality, the low-voltage side often tells a story of additions over the years, different generations of boards, and a mix of ratings and layouts that were never designed as one system. The result is an electrical backbone that technically works but makes fault coordination, maintenance, and expansion hard...
23 October 2024
October 21, 2024 – Houston, TX – Prismecs, a global leader in engineering, procurement, and construction (EPC) services, has secured a prestigious multi-million euro contract from a top Europea...